JCDC Site Offices Project – Firefighting and HVAC Systems Contract
Project Overview:
The JCDC Site Offices span a total external area of 25,476 sqm and consist of the following office buildings and facilities:
Client’s Office: 2,310 sqm
Contractor’s Office: 1,530 sqm
Construction Team Office: 1,530 sqm
Mess Halls 01 and 02: 192 sqm
Control Center Building: 120 sqm
Our Scope of Work:
DATCO has been awarded the contracts for the following critical services:
1. Firefighting System Supply and Installation
We are responsible for the design, preparation, supply, and installation of a comprehensive firefighting system, ensuring compliance with all relevant safety and fire protection codes. Our work includes:
Installation of fire suppression systems, including sprinklers, fire hoses, and extinguishers.
Deployment of advanced fire safety equipment, such as smoke detectors, alarms, and control panels.
Comprehensive testing, commissioning, and certification of the firefighting system for operational readiness.
2. HVAC System Preparation, Supply, and Installation
Our scope in HVAC includes the complete supply, preparation, and installation of systems tailored to the needs of each office and facility. Key details:
HVAC Units Installed:
Wall-mounted split units.
Cassette-type units for ceilings.
Free-standing air conditioning units.
Copper Work:
Supply and installation of copper piping and connections for HVAC systems to ensure efficient and long-lasting operation.
System Commissioning:
Testing and commissioning of HVAC units to ensure optimal cooling and energy efficiency.